Get unlimited access to the best of MySeaTime for less than ₹100/week. Become a member
A chemical tanker has loaded ulsd and master has signed B/L clean on board. The draft survey figure at port of loading show a difference of -20 MTS and draft survey figure in the port of discharging show a difference of -18 MTS. The B/L quantity is 20000MT. Which figure to be taken by master at loading and discharging port?
Join now to access this article and much more.
Admin has placed this article behind a paywall, making it accessible only with a paid membership, which offers numerous perks:
- Contribute to creating a platform for reading and writing without ads.
- Enjoy all content here, including exclusive articles for members.
- Gain access to all exclusive articles for members.
Questions on same topics
Popular questions and their answers
-
New Questions to be asked here.
-
Why category A B and C changed into cat X, Y and Z in IBC code?
-
On tankers how to decide the topping off rate and the time when to reduce rate for topping off?
-
How to perform passivation and cleaning of stainless steel tanks? Any video and information to be appreciated
-
How to find the maximum loading rate of the ship?