Get unlimited access to the best of MySeaTime for less than ₹100/week. Become a member
On Oil/chemical tanker the ODME overboard valve is before the annex 1 and annex 2 overboard lines. How should we proceed for discharging Annex 2 slops in this case ? Do we need to make entry in ORB for this operation ?
Join now to access this article and much more.
Admin has placed this article behind a paywall, making it accessible only with a paid membership, which offers numerous perks:
- Contribute to creating a platform for reading and writing without ads.
- Enjoy all content here, including exclusive articles for members.
- Gain access to all exclusive articles for members.
Questions on same topics
Popular questions and their answers
-
Which pump is not allowed to have a direct connection to overboard?
-
A vessel has discharged small oil into sea while bunkering. What should be the actions of the superintendent of the vessel. How can the ship be back into business and complete bunkering?
-
What are the things that master should verify prior signing oil record book?
-
Can we dispose of food waste in PSSA, let’s say in WETREP?
-
What is the difference between EEOI and EEDI?